zhangxiaosan Legenda soseske
Pridružen/-a: 27.09. 2016, 06:54 Prispevkov: 1069
|
Objavljeno: 07 Dec 2016 09:07 Naslov sporočila: hoses, less than |
|
|
<p>galvanized pipe and stainless steel metal hose to tell you about the relevant charges. This rate is for reference only and does not represent the final offer. The newly changed gas meter First, the galvanized pipe charges 1, the installation of water heater gas part</p>
<p>160 yuan (including 2 m pipe, a cut-off door, less than the same facilities to meet the calculation). 2, change the table, the table after the installation of the stove pipe 260 yuan (including 2 m pipe, a cut-off door, less than the same facilities to meet the</p>
<p>calculation). 3, the pipeline 100 yuan (including 2 m pipe, less than the same facilities to meet the calculation). 4, provides 30 yuan per meter of material accident, the replacement table before the cut-off door 50 yuan, 50 yuan to fight the wall hole. Second, the</p>
<p>wood composite stair tread<br />
how much is a 200 square foot composite deck cost<br />
replace wooden porch composite decking</p> |
|