zhangxiaosan Legenda soseske
Pridružen/-a: 27.09. 2016, 06:54 Prispevkov: 1069
|
Objavljeno: 08 Dec 2016 10:35 Naslov sporočila: So that not only will |
|
|
<p>completely outdoors; indoor sub-gate should also be the same Respectively, check whether the sub-gate is fully controlled branch line. 5, see the meter is installed electricity meter is currently installed more than 10 (40) A single-phase watt-hour meter, running</p>
<p>is normal. Or fast or slow should be repaired. The number of meter readings used, because in the building, workers may use your energy, and the money is not the owners out. The acceptance of water and electricity Note 1, the test pressure should be 1.5</p>
<p>times the working pressure of the pipeline system, and not less than 0.6MPa, the pressure value is generally between 0.6MPa-0.8MPa, not the bigger the better, the pressure time Is not the longer the better. 2, buried in the floor surface layer and the wall of the</p>
<p>yachts with boat decking<br />
cheaper building wood fence<br />
wood plastic composite stair installation</p> |
|