zhangxiaosan Legenda soseske
Pridružen/-a: 27.09. 2016, 06:54 Prispevkov: 1069
|
Objavljeno: 09 Dec 2016 10:11 Naslov sporočila: of labor to complete |
|
|
<p>test; 4, the bathroom waterproof layer (1), waterproof construction should be coated with water; Should be not less than 1.8 m; 5, floor drain, yin and yang, pipes and other places to do a waterproof; 6, floor drain to use deodorant floor drain; 7, hot and cold</p>
<p>water pipe hot left right cold; 8 water pipes try not to go from the ground; 9, cold water pipes in the wall to have 1CM protective layer, hot water pipe is 1.5CM, so the slot to open deep; 10, installed PPR tube is to consider the thickness of the tile posted</p>
<p>good, so the tube will not be exposed; 13, the toilet can not be used to install the cement, use silica gel; 14, the water can not be used, the water can not be used; 16, the washing machine to consider is on the drainage or under the drainage; 17, the bathroom is</p>
<p>composite wood diy deck singapore<br />
composite floor replacement boat<br />
best teak and holly flooring marine supplier</p> |
|