zhangxiaosan Legenda soseske
Pridružen/-a: 27.09. 2016, 06:54 Prispevkov: 1069
|
Objavljeno: 25 Okt 2016 08:58 Naslov sporočila: based, do a good job of service |
|
|
<p>between 20 to 30 days. Relative to the plate furniture, the door of the process is more complex, need to go through wood drying, roughing, sanding, sealing more than 30 procedures can guarantee the formation of doors and mirror-like silk silky paint. Sixth, the installation of finished doors Wood doors require a higher installation, such as the need to adjust the level of installation and verticality, the door plate and the wall part of the gap to play a blowing agent, the door will not only affect the installation of the </p>
<p>entire indoor effect, and will Affect the normal opening of the door, so the installation of this link is extremely important. A high-quality, high standards, training and orderly installation of the team is the quality assurance. Seven, the normal use and maintenance of wooden doors 1, the product is installed, not on the paint products should be within five days of oil. 2, dry, windy season, the construction site doors and windows to be closed to reduce the impact of air circulation on the door; at the same time to keep </p>
<p>indoor and outdoor temperature and humidity consistent to prevent deformation of the door leaf (especially for a long time do not use the environment). 3, under normal circumstances to keep the doors closed, double doors should be plugged in order to prevent collision, damage; in the heating, stopping the special circumstances of the beginning, to keep the door is open, to avoid heating caused by both sides of the door Uneven temperature caused by the deformation of the door. 4, should not hang heavy </p>
<p>ultra deck fusion decking end caps<br />
plastic floors greece<br />
plastic manufacturer italy</p> |
|